CNC Machined Semiconductor Equipment Australia

Custom semiconductor equipment parts. Wafer handling robots, vacuum chambers, gas manifolds, lithography stages. Cleanroom-grade. Quote in 2 business days.

Semiconductor Equipment Components We Manufacture

Ultra-precision cleanroom components for wafer processing, deposition, lithography, and metrology equipment.

Wafer Handling Robot Components

Robotic arm mounts, gripper housings, end-effector components. Sub-micron precision for wafer positioning.

Vacuum Chamber Parts

Chamber baffles, mounting flanges, viewport mounts. UHV-compatible materials and finishes.

Gas Distribution Manifolds

Precision gas flow control manifolds. Stainless steel with ultra-clean internal passages.

Lithography Stage Components

X-Y stage components, alignment fixtures, optical bench mounts. Nanometer-level precision.

Ion Implanter Parts

Ion source housings, acceleration column components, wafer target holders.

Chemical Mechanical Planarisation Components

Pad conditioning components, slurry distribution systems, pressure balancing parts.

Custom Cleanroom Equipment Parts

Bespoke cleanroom components for custom-built semiconductor equipment.

Materials Available for Semiconductor Equipment

MaterialGradeKey PropertiesBest For
Stainless Steel316LUltra-clean, low outgassing, electropolishableVacuum chambers, gas manifolds, wafer contact surfaces
Stainless Steel304Lower cost, adequate cleanroom compatibilityNon-critical cleanroom components
Aluminium6061-T6Lightweight, excellent machinability, anodisableStructural mounts, non-product-contact parts
PEEKVirgin PEEKNon-conductive, low outgassing, high-temperatureElectrical insulation, vacuum applications
TitaniumGrade 2Ultra-pure, non-magnetic, excellent vacuum propertiesUltra-high vacuum components, critical applications
CeramicsAlumina/ZirconiaInert, non-conductive, vacuum-compatibleInsulators, process chamber liners
High-Purity MetalsCu, W, MoUltra-pure sourcing, contamination-freeElectrode materials, deposition targets

Manufacturing Capabilities

Ultra-Precision Machining

Sub-micron tolerance machining routinely. ±0.005mm on critical dimensions. CMM verification. SPC and Cpk monitoring.

  • Sub-micron tolerances
  • CMM inspection
  • SPC verification
  • ±0.005mm routine

Cleanroom Processing

Cleanroom-compatible machining and finishing. Electropolishing per ASTM A967. Ultra-high vacuum compatibility.

  • Electropolishing available
  • Outgassing certification
  • UHV compatible
  • Particle control

Semiconductor Expertise

Deep expertise in semiconductor equipment and processes. Fab-compatible specifications. Full documentation for SEMI standards.

  • SEMI standard compliance
  • FAB-compatible specs
  • Process documentation
  • Traceability records

Quality & Compliance

CMM inspection (sub-micron verification)

Material certifications and traceability

Electropolishing per ASTM A967

Outgassing and contamination testing

UHV and vacuum compatibility

SPC and Cpk process monitoring

Full dimensional documentation

SEMI and ISO standards compliance

Lead Times & Quantities

1 Piece

7–15 Business Days

Cleanroom component with full verification and documentation.

2–5 Pieces

10–20 Business Days

Small batch with SPC and CMM records.

5+ Pieces

15–30 Business Days

Production run with optimised per-unit pricing.

Semiconductor Equipment FAQ

What materials are best for cleanroom environments?

316L stainless steel is the standard for cleanroom equipment — low outgassing, excellent corrosion resistance, easy to clean. PEEK is used for non-conductive applications and high-temperature environments. Aluminium is used for non-contact structural components. All materials can be electropolished for ultra-clean surfaces.

Can you achieve the precision required for semiconductor parts?

Yes. Semiconductor equipment requires sub-micron tolerances. We routinely hold ±0.005mm on critical dimensions. CMM inspection, surface profilometry, and SPC are standard. Cleanroom machining available.

What is the typical lead time for semiconductor equipment parts?

Cleanroom components typically require 7–15 business days depending on complexity and certification requirements. Ultra-precision parts may require 15–30 business days. Lead time includes final validation and documentation.

Do you offer ultra-high purity materials?

Yes. We source ultra-high purity materials for semiconductor applications. Full material certification and outgassing data available. NSF/FDA-compliant material sourcing.

Can you manufacture parts for vacuum applications?

Yes. Vacuum-rated components are machined to eliminate outgassing sources and micro-porosity. Surface treatments and sealing surfaces are optimised for vacuum compatibility. Vacuum testing available.

What surface finishes are available for cleanroom use?

Electropolishing per ASTM A967 (ultra-clean finish, low particle shedding), passivation per ASTM A967, and ultra-high vacuum (UHV) finishing. All finishes specified to minimise contamination.

Get a Quote in 2 Business Days

Upload your semiconductor equipment drawing and receive a quote for ultra-precision cleanroom components — finished and fully documented.

Start Your Quote →